Maison De Laluz Hotel

Style: European classical style

Area: 62 hotel rooms, hotel lobby, restaurant

Address: New Orleans, U.S.

Luxury-Boutique-Hotel-New-Orleans-16

Project Introduction

In order to be the best, the owner of this hotel hired a team of local designers from the United States to manage the interior design. After two years, they settled on the final design scheme. However, the client decided to source from China due to significant disparities between the actual products and the design and the high costs locally in the US.

Initially, the person in charge found us through the Google search engine. We had a brief voice call to understand each other, followed by a video conference a few days later to delve into the project details, allowing us to gain a deeper understanding of this hotel project.

We unanimously focused on matching different products and materials for the next two weeks to achieve the best possible restoration of the original custom design. We finally decided on a few preliminary plans and began preparing samples. Throughout this period, we consistently communicated about other product details until the hotel owner visited our company with his designers a month later. 

We then scrutinized each material style and texture for every area (from the hotel lobby, restaurant, corridors, and rooms to floors, walls, and ceilings). After several modifications and adjustments, we spent five days finalizing the plan. Nonetheless, the counterparty remained apprehensive about potential discrepancies in bulk orders. 

Consequently, we first produced products for five rooms. Upon delivery in the US, the client was extremely satisfied, which led to us receiving the entire hotel order. The production of the entire hotel’s goods took three months, with deliveries being made progressively.

In total, we dispatched 20 containers. Once the goods arrived at the construction site, our team of engineers consistently communicated with the hotel’s construction team, providing different pictorial and video guidelines for installation issues. Ultimately, it took six months to complete the installation of all products.

More Details About This Project

Contact us

We will email you within 24 hours. If your project is urgent, please feel free to call +86 185 2096 9094 directly.